10/01 – now |
BOVIS LEND LEASE PHARMACUETICAL |
|||||||
|
|
ALAXANDRA COURT, CARRS ROAD. CHEADLE – working for Elstead Office |
|||||||
|
Glaxo SmithKline – Harlow (ROBOTICS) |
||||||||
|
Member of the design team coordinating working drawing to achieve a confirmed maximum price |
||||||||
|
Contract foreshortened due to lack of committed projects |
||||||||
7/99 – 10/01 |
ABBEY HOLFORD ROWE, Architects |
|||||||
|
|
SUNLIGHT HOUSE, QUAY STREET, MANCHESTER. – BASED @ MANCHESTER AIRPORT |
|||||||
|
Manchester Airport – T1, T2, & Infrastructure Team. |
||||||||
|
Proactive member of the Core Strategy Team running in conjunction with Airport Facilities Management, preparing information and documentation to enable case studies to be allocated and consultants prepare proposals to take the Airport forward to 2015. |
||||||||
|
Manchester Airport - T2 Terminal Extension (Lead Consultants) Initial concept |
||||||||
|
Project Design Development Manger (designate) responsible for facilitating the clients design brief, co-ordination of consultants, promoting the design and overseeing all associated technical aspects to budget and programme. This will culminate in preparing tender / contract documentation to achieve the anticipated completion date of 2005. |
||||||||
|
|
Manchester Airport - T2 Bussing Facility (Lead Consultants) + various small works projects |
|||||||
|
Architectural Project Manager coordinating the new 800 PAX T2 Bussing Lounge to facilitate the anticipated requirements for ‘off stand gating’ of aircraft and associated increase passenger flow. This involved developing the design brief through to preparing tender documents, contract administration and on site quality management on behalf of the client. – Completed on time & within budget |
||||||||
|
Landmark Developments – No. 1 The Interchange Bradford (Lead Consultants) |
||||||||
|
Architectural Project Manager responsible for design and development of a prestigious speculative office building to achieve the clients brief. |
||||||||
|
CP Pharmaceuticals, Wrexham (Lead Consultants) - Architectural Project Manager |
||||||||
|
Manchester Airport - Ground Transport Interchange |
||||||||
|
Cardinal Heenan School (PFI) - Leeds - Design Manager |
||||||||
|
Aktau International Airport (D&B bid Fitzpatrick International) |
||||||||
|
|
Architectural Project Manager responsible for the concept design in the preparation of Design and Build bid for Regional Airport and Cargo Centre. |
|||||||
9/98 - 7/99 |
Sabbatical in Jakarta, Indonesia |
|||||||
97 – 9/98 |
JOHN LAING INTERNATIONAL (LAING ABU DHABI) |
|||||||
|
|
ABU DHABI, UNITED ARAB EMIRATES
|
|||||||
|
Architectural Project Manager |
||||||||
|
Abu Dhabi Company for Onshore Operations (ADCO), New Headquarters Office Complex (FIDIC) 17 storeys piled RC construction, adjoining existing building, clad with Curtain-walling and Granite. Roof top plant room with acoustic floor and walls. General internal finishes - Granite, marble, timber panelling and stainless steel. Executive floor and Auditorium – high quality finishes. Full a/c, data structured cabling, complex external servicing. |
||||||||
|
Setting up and overseeing large design office and providing
the interface between client and the on site team to achieve detail.
Control of production information, client submissions contract administration
and implementation of Project Quality Plan. In-house programming and progress
reports to compliment Project Master Plan. Perform Project Risk Assessment and control of
sub-contractors to achieve budget and programme. Co-ordination of external and
internal Granite / Marble finishes including developing the bracket
design with the French Subcontractor. Administration of the total finishing
packages with regards to both design and supervision on site to achieve
a high quality finish as determined by the client, co-ordinating the
in-house consultants and local subcontractors. Contract closeout, document
control, documentation for use as support of claim, as-built
drawings and O & M manuals. |
||||||||
1996 – 6/9 |
ICI, EUTECH ENGINEERING, SEC |
|||||||
|
|
BRUNNER HOUSE, NORTHWICH, CHESHIRE
|
|||||||
|
Project Manager |
||||||||
|
Headquarters Office refurbishment |
||||||||
|
Formulation of Proposals, Costing, Project Risk Assessment, Programme
and Detail Design for submission to in house clients. Production tender
information, contract administration, co-ordination of Consultants,
Contractors, Sub-contractors and on site quality management. |
||||||||
1995 - 1996 |
PARR PARTNERSHIP ARCHITECTS |
|||||||
|
|
38 UNION STREET, GREENOCK, SCOTLAND
|
|||||||
|
Architectural Project Manager |
||||||||
|
National Semiconductor UK Ltd, UK Roadmap Project. |
||||||||
|
Responsible for the project design team and contract
administration. |
||||||||
1995 |
COSTAIN LIFE SCIENCES (Company ceased trading) |
|||||||
|
|
COSTAIN HOUSE, STYAL ROAD, WYTHENSHAWE, MANCHESTER
|
|||||||
|
Design Manager |
||||||||
|
SmithKline Beecham, High Bay Warehouse and Dispensary,
Crawley. |
||||||||
|
Responsible for Design Team & Co-ordination of other in house consultants to achieve cGMP. |
||||||||
1994-1995 |
JACOB’S ENGINEERING |
|||||||
|
|
PARK HOUSE, PARK CIRCUS PLACE, GLASGOW
|
|||||||
|
Architectural Department
Manager |
||||||||
|
SmithKline Beecham, Paroxetine Production Plant, Irvine,
Scotland. Microbiological Associates, CL3 Laboratory, Innovation Park, Stirling. Upgrading of labs to class IV |
||||||||
|
Department head responsible for achieving technical scopes within budget and programme. Supervision of production information. Co-ordination of other in house consultants to achieve cGMP. Contract administration, client liaison and interaction with site to achieve an accelerated programme. |
||||||||
|
|
|
|||||||
|
|
|
|||||||
Previous Contracts |
|
|||||||
|
Emerson Group |
Infrastructure @ Bolton Wanders FC ground and retail estate; Retail parks. |
|||||||
|
Haremead. |
Pharmaceutical projects through out Europe |
|||||||
|
AMEC Design and
Management |
Biological Research Facility, Brockham Park |
|||||||
|
Geoffrey Reid
Associates |
Management Architects for the Merry Hill Center, West Midlands |
|||||||
|
Sheared Walshaw
Partnership |
Fast track commercial projects |
|||||||
|
Ratcliffe Groves
Partnership |
Retail parks at various location in the UK; Design Studio and high bay warehousing for a national retail outlet |
|||||||
|
Building Design
Partnership |
M.o.D. / P.S.A. Overseas - Falkland Islands - Military Installation and Hospital Complex. |
|||||||
|
Multi-Design
Consultants |
ICI - Special Tablet Facility, Macclesfield; Peoples Republic of China - Working House and Offices - Grain Terminal, Tianjin. |
|||||||
|
Mills Group Partnership |
Various small projects |
|||||||
|
||||||||