Air-Rail-Oil.com  CONSTRUCTION PEOPLE Air-Rail-Oil Career Profile

CURRICULUM VITAE

 

 

 

PERSONAL DETAILS

 

 

 

 

NAME:

JOHN ALFRED FISH

 

 

PRESENT POSITION:

Senior Engineer

System Application/Instrumentation

 

 

QUALIFICATIONS:

Full Technical Certificate

“Production Design” Part II

(HNC equivalent)

 

 

DATE OF BIRTH:

16 December 1947

 

 

PLACE OF BIRTH:

London, England

 

 

 

 

E-MAIL:

A-R-OMail

 

 

MARITAL STATUS:

Single

 

 

PROFESSIONAL MEMBERS:

Senior Member of “Instrument Society of America”

Member No. 04038130

PROFESSIONAL EXPERIENCE:

 

December 1999 to August 2002       BOC PACKAGED SYSTEMS – GUILDFORD

 

Lead Engineer – Packaged Plant Projects

 

Significant Achievements:

1.       Lead engineer on the following packaged plant projects

·         Owens Corning Ravenhead UK – O2 VSA

·         Owens Corning Wrexham UK – O2 VSA

·         St.Gobain Eggborough UK – H2/N2 Mixing Skid

·         BP Grangemouth UK – CDA

·         Atmel North Tyneside UK – 5000 N2 Plant + TPV 

 

2.       Managed and developed outsourced design offices ( IES Arran Controls )and ( Kvaerner Portsmouth )

 

3.       Assisted in compilation of ‘Global Scope of Supply Document’

 

4.       Applied European Standards to USA products

 

5.       Managed Kvaerner Alliance Instrument Department

 

 

 

Special Knowledge & Skills :

 

·         Team Leader responsible for one engineer, one designer and outsource Design offices.

·         P & ID reviews, HAZOPS, HAZIDS and Safety reviews

·         Plant pre-commissioning and Operator training

·         Analysis/Control Panel and DCS system testing and inspection

·         Senior member of the ‘Instrument Society of America

·         Experience on following DCS systems:-

a). Seimens TI 545    b). Honeywell TDC 3000  c). Turnbull Controls 6000

d). ABB/Taylor MOD 30 and MOD 300

·         DNV IEC 61508 Compliance Course

·         Oxygen Compatibility Course

 

Relocation comments:

 

Would consider relocation to another country if the package was acceptable

 

 

1994 to 1999:

BOC PROCESS PLANTS - GUILDFORD

 

Senior Engineer - Generation of all design documentation, technical bid evaluation and vendor documentation for all instrumentation.

Inspection and testing of DCS (Texas T1-545) system and analysis control panels.

 

270 TPD + TPV Tuscaloosa USA

377 TPD + TPV Kangwon Korea

400 TPD + TPV Map Ta Phut Thailand

 

 

 

September 1993 to

August 1994:

BABCOCK KING-WILKINSON LTD - CRAWLEY

 

Senior Engineer - Generation of Data Sheets and Specifications on “In System” and dBASE IV software packages

 

-  Haradh Gosp 1 - Aramco - Saudi Arabia

 

Preparation of Bids for:   Haradh Gosp - Aramco - Saudi Arabia

                                    Senoko Gasworks - Singapore Pub

                                    Ruwais Gup Expansion - Adnoc

                                    Ras Tanura - Refinery Upgrade - Aramco - Saudi Arabia

 

 

Jan 1992 to

Aug 1993

BROWN & ROOT - WIMBLEDON

 

Senior Systems Application Engineer - responsible for Honeywell PCDM/TDC 3000 DCS system on Murdoch and Caister offshore platforms, and Theddlethorpe onshore terminal.

 

Including:

 

a.         Satellite onshore/offshore communication system.

b.          Dual Redundant PLC interface with G P Elliott platform protection system.

c.          Interface with onshore based Rosemount system 3 computers

 

Design, construction and functional testing at Honeywell, Bracknell.

Installation and pre-commissioning on platforms at AMEC, Newcastle.

Installation and commissioning of onshore system at Theddlethorpe gas terminal.

Triangulation communication system control and monitoring testing, via satellite, from onshore system.

Caister and Murdoch Gas Fields - Project for Conoco (UK) Ltd

 

1991:

 

BABCOCK CONTRACTORS LTD - CRAWLEY

 

Senior Engineer - Preparation of data for an ABB/Taylor MOD 300 DCS System with an I/O of approximately 23,000 points.

 

Drax Flue Gas Desulphurisation

Project for National Power

 

1988 to 1990

 

JOHN BROWN LTD - WOKING

 

Systems Application/Senior Instrument Engineer - Responsible for preparation of ELDs, Loop Diagrams and Schedules for Reaction Area.

 

Responsible for Design, Specification and System selection of ABB/Taylor MOD 30 System.  Detailed engineering of ICN Networks and MOD 30 configuration.

 

Polyethylene Plant Modernisation.  Budyennovsk Russia.

 

 

 

 

1983 to 1988:

 

BOC CRYOPLANTS LIMITED - LONDON AND GUILDFORD

 

Lead Engineer - Responsible for design, specification and inspection of Supervisory Control Systems.

 

i.        130 TPD ASU/440 TPD Nitrogen Liquefier unit.  Thame fully automated (unmanned) plant.  Taylor MOD 300 system (DDC).

ii.       1050 TPD Oxygen Plant - Margam for Port Talbot Steel Works.

          TCS System 6000 Maxivis III

iii.      1700 TPD ASU/600 TPD Liquefier - Scunthorpe

          TCS System 600 Maxivis III

iv.      LNG based ASU - FEIG Taiwan

          TCS System 6000 Maxivis III

 

 

1981 to 1983:

WORLEY ENGINEERING LTD - LONDON

 

Senior Engineer - responsible for specification of instrumentation for oil and gas platforms.  Duties involved preparation of data sheets, enquiries, requisitions, completion of bid analysis and review of vendor drawings and documents.  Preparation and coordination of requisition packs for lead engineer.  Liaison with clients.

 

“Rough Storage” platforms comprising of two drilling and one production/reinjection platform.

 

Project for British Gas.

 

 

1978 to 1981

LUMMUS NEDERLAND B.V. - HOLLAND

 

Senior Engineer - Responsible for generation of control panel and auxiliary equipment for thermal cracker, Shell Curacao.  Preparation of computer take-off of total hardware and ancillary equipment required for LNG plants, Yanbu, Saudi.  Supervised specification and requisition of Abquiq Nos. 5 and 3 gas/oil separation plant, Saudi - Aramco.

 

1977 to 1978:

 

MATTHEW HALL KEYNES - HOLLAND

 

Engineer - Site survey, investigation of as built installation, specification and requisition of revamp equipment for Rotterdam Visbreaker project, Esso Holland

 

 

 

 

1976 to 1977:

 

LUMMUS CO. LTD - LONDON

 

Engineer - Supervised development of sea fastening procedures.  Generation of documentation for scheduling of hazardous equipment for Lloyds insurance.  General engineering duties.  Central platform Ninian, Chevron Petroleum.

 

 

 

 

 

 

 

 

 

 

1974 to 1976:

BOC CRYOPLANTS LTD - LONDON

 

Senior Designer/Engineering Assistant - Supervised design and specification of all instrument installation materials and equipment.  Responsible for design, development, requisition and inspection of control panels.  Generation of all design documents for Nitrogen plants, Hong Kong Oxygen, BOC Grangemouth and LNG plant for British Gas, Avonmouth.

 

 

1974:

 

CREST UK  INTERNATIONAL - LONDON

 

Senior Designer - Generation of electrical/pneumatic control loops, process hook-ups, area layouts, control panel specifications/layouts/wiring and piping details.  Preparation/ evaluation of purchase requisitions for control panels, supply systems and installation materials etc.  Detailed job estimates manhour/materials.  Onshore facilities for Aramco (Abu Dhabi).

 

 

 

1973 to 1974:

 

PROCON (GB) LTD - LONDON

 

Senior Designer - Generation of all design documents for 100,000 BPD Grassroots refinery, Newfoundland Refinery Co (Come-by-chance).  Paraffin Preparation Plant, Saras Chemical S.p.A. (Sardinia)

 

 

 

1973:

 

SIM-CHEM - LONDON

 

Senior Designer - Supervised flowsheet design team, generation of P&IDs for oil and gas terminals, Phillips Petroleum Co (Ekofisk).

 

1971 to 1973:

 

FLUOR (ENGLAND) LTD - LONDON

 

Senior Designer - Generation of all design documents.  Preparation/evaluation of specifications and requisition packs for control panel, supply systems, installation meterials, etc..  Detailed job estimates manhour/materials.  Aramco Contracts, Blowdown Areas (Ras Tanura) Gosp No. 3 and 5 (Berri) Offshore facilities (Berri).

 

1970 to 1971:

 

PROCON (GB) LTD - LONDON

 

Designer - Full graphic layout of panel fascia 60 ft. span.  Preparation of design drawings,  job manhour reports,, material take-offs and definitive bids/estimates for materials and manhours.  Vinyl Chloride Manomer and Polyethylene complex.  Dow Chemical, Korean Pacific Chemical Co (Korea).  80,000 grassroots refinery, Amoco (Milford Haven).

 

1964 to 1970:

 

BRITISH OXYGEN - CRYOGENICS - LONDON

 

Draughtsman - (5 years as an indentured apprentice).

Training School general engineering lectures and practical - 6 months.  Workshops - 2 years.

 

Reference Library (members only)
Please help support this website by buying from one of our affiliated companies... Buy here!