|
CURRICULUM
VITAE Nationality: British Age 43
e-mail : A-R-OMail ENGINEERING QUALIFICATIONS ENGINEERING EXPERIENCE
British Gas qualified Painting
Inspector
Auditing course BS EN ISO 9000
PSA 10 & GBE / CW6 and Contract protocol awareness
CSWIP 3:1 Welding Inspector BNFL experienced Technician Sellafield Nuclear Plant UK. Institute of Corrosion ICOrr Qualified painting Inspector Technical report compilation City & Guilds Electrical/Mechanical Trained in confined spaces Engineering operations ICI Petrochemicals Thermal metal Spraying, Specialist Coatings PC Literate in Microsoft application & Inspection AWS & B.S IT Packages Word.Excel
CAREER EXPERIENCE SUMMARY
Client coatings Shutdown Engineer for GASCO on gas process twin stream reactor 2001 Program for (OPD) operations inspection Division.Project management of EPC contractor Bechtel
Client specialist Coatings Engineer for ADNOC major
projects division at on-shore gas development Phase I,II project built
by EPC Contractor Technip/Bechtel at a cost of 1.6 Billion U.S . (recruited
by Client after completion of Bechtel contract).
Client coating/welding specialist for EPC Contractor Technip/Bechtel on above Project OGD I OGD II Constructed for Abu Dhabi National Oil Company ADNOC. Client Project coatings Engineer for MODA Ministry of Defence and Aviation Saudi Arabia, construction of classified military installations at several sites in Kingdom by ABV at estimated cost of 63 million U.S Project coatings and welding manager at Viking Johnson Birmingham UK Registered British Gas Contractor on Fusion Bonded Epoxy ( fluidized bed) pipeline coatings GBE CW6. Client Project co-ordinator/QC Auditor for Entec Engineering Consultants UK , ISO 9001 & 9002. Project Pipeline coating/welding Inspector Saudi Aramco Jizan-Abha API 11O4,SAES Jan 01-Aug 01 Previous Project SPECIALIST COATINGS
ENGINEER ON-SHORE
GAS DEVELOPMENT PHASE II HABSHAN,
UAE ADNOC
MAJOR PROJECTS DIVISION , CONTRACT No 1219, CONSTRUCTED
BY EPC CONTRACTOR TECHNIP/BECHTEL FOR 1.6 BILLION U.S Seconded to Abu Dhabi National
Oil Company (ADNOC) as Specialist Coatings inspection Engineer to assist
Client Third party inspectionTeam in Thermal metal sprayed and mainstream
coating operations on Site, management of EPC Contractor Technip Bechtel,Supervisors
and QC teams on all site painting/coating
operations, to support mechanical completion and commissioning activities.
Project responsibilities
Coatings (specialized)
Thermal Sprayed Aluminum
critical coating application and testing to AWS Standard on hot gas pipelines,sulphur reactor units,storage
vessels reaction condenser modules
and acid gas by-pass equipment.
Refractory
lining of hot gas by-pass units and evaluation and repair of reactor
and boiler units, testing also included compressive strength and bulk
density evaluation in on Site MTS,UKAS Materials Laboratory. Fireproofing
inspection, on application and testing of cementacius Pyrocrete on LNG high pressure gas storage sphere structural
steelwork Fireproofing of L/V and
H/V Junction boxes and cable installation with
Thermolag 351-43 and 3000
and Darmatt fire protection materials.
Coatings ( mainstream) Mainstream
coatings of pipework ,tanks storage vessels and structural steel. and FBE coating and testing of sub-surface pipework for holiday free coatings. Insulation
Cryogenic insulation operations on pipelines storage tanks,vessels and line-valves. PIR Securement, vapour barrier application, jacket fitting and sealant. P.U foam Insulation of LNG storage spheres,vapour barrier and final coating application. Thermal Personel Protection insulation on pipework,vessels and tanks inspecting rockwool lagging fixing and final jacket sealant. Acoustic Insulation on pipes and valve boxes with embossed reinforced lead lined Aluminum weather jackets. Welding
Inspection of butt welds on pipe networks and Vessel sleeve
using TIG, SMAW &
SAW Welding processes and Isometric control documentation review and acceptance. QA/QC
Laboratory Audits, Inspection test plans review on above disciplines, MCC walkdowns,Punchlist co-ordination,test pack review and calibration audits on Principal EPC Contractor Technip/Bechtel. . Sept 99-Aug 00 CLIENT THERMAL ALUMINUM SPECIALIST
PROGRAMME
COORDINATOR ON-SHORE
GAS DEVELOPMENT PHASE II HABSHAN
ABU DHABI UAE Seconded to Principal EPC
Contractor Technip/Bechtel Project management team by Black & Veatch
Pritchard Kansas city U.S,to coordinate the fabrication and coating
of 42 & 48 inch feeder gas pipelines and pipe systems on a 1.6 Billion $ reprocessing Plant for the Abu Dhabi National Oil Company ADNOC, in remote desert location. Project responsibilities
Safety, format of job hazard assessments,work
permits and operational procedures
for confined space working. Supervision of multi-national QA/QC personnel during fabrication welding in both field and shop and supervising metal spraying operations. Specialist Coating
Supervision at all stages
of critical application of Thermal arc sprayed aluminum to
Pipelines, Vessels and fittings. Qualification of spraying operators to project specifications and procedures, review of Inspection test plans and quality control procedures, contractor method statements and material approval testing working within a ISO 9000 quality System. Welding/ NDT
Supervision of multi-national sub-contract welding supervisors in field and shop to ensure all the welding procedures were strictly controlled throughout the fabrication operations to ensure no damage occurred to aluminized spools and fittings by using low heat input welding techniques. Program coordination of spools in fabrication shops to maintain priority order for field construction and ensuring correct welding techniques were applied using TIG,MIG and SMAW processes with full visual and NDT inspection carried out with MPI ,UT and R.T techniques. Mar 99- Sept 99 CLIENT
PROJECT COATINGS ENGINEER
(MODA)
MINISTRY OF DEFENCE & AVIATION
SAUDI ARABIA Project constructed and
designed by EPC Contractor ABV throughout the Kingdom
of Saudi Arabia at an estimated
cost of 45 million U.S. Project specific ,locations,
operations and documentation
remain classified information under Saudi Arabian
Military Law ,via the official non-disclosure document signed by all personnel prior to commencement of Contract. Project responsibilities
Management of EPC Contractor ABV, fabrication shop and coating Plant Managers,Supervisors and QC personnel comprising of an multi- Naional workforce. Responsible for all coating operations on site and remote desert locations off site and project documentation review Dec 98-Mar 99 CLIENT COATING INSPECTOR SAUDI ARAMCO
Working as Client pipeline coating Inspector
on 250 km pipeline for Saudi
Aramco in desert/ mountain environment in Western Province, Jizan desert. Project
responsibilities Supervising all mainline
stringing and pipelaying operations together with
Field weld repair systems ,QC personnel , project documentation and daily Safety operations associated with the hazardous geographical site location. Nov 98-Dec 98 CLIENT COATING INSPECTOR/AUDITOR
PDM FABRICATION
PLANT , YANBU SAUDI ARABIA Seconded by Client to carry
out technical audit and works inspection
Prior to fabrication and coating operations commencing, to ensure the Sub-contractor was working to an ISO 9002 quality system and had the Equipment and professional workforce to fabricate and coat linepipes to our Project specifications. Nov 97-Nov 98 PROJECT COATING & WELDING MANAGER VIKING JOHNSON FABRICATORS, BIRMINGHAM Seconded
by Entec Engineering Consultants to manage fabrication and Coating of linepipes for ICI pipeline networks both at plant and on site. Project
responsibilities Full technical audit of plant coating and fabrication operations working to an ISO 9002 Quality System. Managing all Supervisors and QC Personnel on a 24 hour 3 shift production system,including Client QC Technicians and Inspectors and all handover documentation. Supervision of pipeline installation at site location ICI Petrochemical link-lines Tunnel II ( South) Wilton Teesside. Operations, included Format of risk hazard assessments, and method statements for Submission to ICI operations in order to carry out installation and Inspections on petrochemical link-line
restricted areas. June 96-Nov 97 CLIENT QC COORDINATOR UNIVERSAL PIPE COATERS LTD
( UPCL) IMMINGHAM U.K Seconded to UPCL by Northumbrian Water test laboratories to coordinate the Internal and External coating of 1200 46 and 48 inch linepipes, that were to be Used in the Interceptor phase I project at Bransands site Cleveland U.K.
Project responsibilities Supervision of all coating
rig operations using Hydrocat multiple pass booms Field repair teams using twin pack epoxy and polyurethane wet systems,field and shop high voltage holiday detection teams,QC Inspectors and dispatch Supervisors and all calibration and final handover documentation to Client. Apr
96-June 96 R & D
COATING SUPERVISOR TUNNEL II ICI
WILTON PETROCHEMICALS TEESIDE OPERATIONS Seconded to ICI to survey coating quality of internal and external experimental weld repair compound, for remedial of butt welds on ICI hydrocarbon Link-lines in Tunnel II Project crossing the river Tees in Cleveland. Project
responsibilities
Supervision and survey of application and testing of versapox weld repair compound WFT/DFT Inspection of all field weld coatings,dielectic strength and high voltage holiday experimental testing on site.Confined space training of contractor,risk assessment format,breathing apparatus firefighting training and gas detection in special hazards environment.Final report documentation to Client. Aug 95-Apr 96 CLIENT PROJECT COORDINATOR WELDING/COATING:
MOTHERWELL BRIDGE ENGINEERING Seconded by Entec as Client Project coordinator on welding/coating operations at main plant and at site on 46 inch linepipes,fittings and main storage tank farms Project
responsibilities Inspection and technical audit of works prior to contract award on fabrication and Coating plants and all sub-contract vendors to an ISO 9002 Quality Standard. weekly inspections of pipe production plant and documentation review on calibration, Vendor material tracibility,Hydrostatic testing,sub-contract coating personnel and weekly progress report to client for site construction
program. July 95 Aug 95 R&D TECHNICIAN NORTH SEA PIPELINES ( ENTEC) Seconded to North Sea Pipeline Team to design a program to evaluate the suitability of paint systems submitted by several coating manufactures throughout the UK for use on pipelines in a hostile corrosive off-shore environment The system that was selected for use would be evaluated and reported on within 10 days. Project responsibilities Supervision of Technicians and sub-contractors,testing rig construction to B.S Standards for Abrasion, chemical attack, adhesion, cyclic,impact, dielectric strenghth,point loading and High voltage holiday detection and final technical report to Project Engineer
Apr 95 July 95 LABORATORY TECHNICIAN BNFL PLANT SELLAFIELD CUMBRIA Seconded to Sellafield Nuclear Plant to survey concrete floors and laboratory offices for radiation contamination prior to de-commissioning operations of Hero Reactor building.
Apr 78 Apr 95 BRITISH GAS TRANSCO( PIPELINE MAINTAINCE). Maintenance and installation of low and high pressure pipelines,working on coating operations Welding, PE butt fusion, flow stop operations,pressure monitoring,pnuematic pressure testing In-line cut-outs and connections,cathodic protection to AGI Station supply lines,firefighting.
Pre
1978 MECHANICAL FITTER Qualified in City & Guilds Mechanical Engineering as part of Engineering apprenticeship. |
||||||
|
||||||