RESUME PERSONAL DETAILS NAME : RAY HENRY BUCKENDAHL
E-MAIL : A-R-OMail NATIONALITY : Australian
DISCIPLINE : Project Electrical EngineerSECTORS
: Oil&Gas/Power Generation/Construction/Engineering.
EDUCATIONAL QUALIFICATIONS
Woodville
High School Leaving PEB Credit
pass.
Kilkenny Technical
College 3RD
year Electrical Diploma. 4TH
year Electrical Diploma.
5TH year Electrical
Diploma.
Industrial Electronics I & II Diploma. Graduated credit pass and with General Application award. Adelaide Teachers College : Technical Education
Teaching Diploma. Technical Education Trainer : Department of Technical Further Studies.
Institute
of Technology (1972) :
Electrical Engineering Diploma.
Bachelor of Engineering (1984) :
Mechanical Engineering Diploma.
ELECTRICAL LICENCES : ECL 154795 / EW 136094 (S.A & W.A)
Holder of “A” Class
Licences :
South Australia & Western Australia.
Holder of Electrical
Contractors Licences : South
Australia & Western Australia.
Holder of Australian Electrical
Fitter & Mechanics Indentures with General Prize Award.
Experienced with Air-conditioning / Refrigeration / Hydraulics / Pneumatics / SCR systems / Power Generation AC & DC / Rotating Machines / DCS, PLC, DCIS systems. EMPLOYMENT HISTORY 2000 – SEP 2001 MAXUS OIL COMPANY -
PROJECT ELECTRICAL ENGINEER Employed
with the Maxus Oil Company being responsible for the following
Projects : FPSO and Shuttle
Barge project as the Company Site Representative ; Gas Turbine Generators
rewind and repair (4.27mw) ; New Production Vessel project involving
all electrical, instrumentation, mechanical, piping, construction and
completion activities. Flare
ignition systems, Process Control Rooms / Switch Gear and MCC’s / Fire
& Gas, Transformer / testing / installation of ; Offshore Barge and Drilling Vessel Technical surveys / equipment operations for acceptance with all QHSE / Safety requirements. Production platform complexes, Power Generation Units, Accommodation Modules, Compressor Skids, Utilities Modules and all HV / MV / LV service grid systems. Responsibilities
included planning, scheduling,
required man-power and man-hours, supervision of
sub-contractors / installation personnel and training of O &
G personnel. 1997 - 2000 PROJECT ELECTRICAL ENGINEER Employed
in Oil & Gas, Power
Generation, Transmission, Distribution, Engineering and for a major
Electrical Service Company involved in Field Service projects where
I was responsible for Power Generation / services and rotating equipment refurbishments.
Employed
with Main Contractors for the
following International Oil Companies ;
Maxus, Arco, Conoco, Unocal, Total, Mobil, Kodeco, Esso, Santa-Fe,
Shell and Aramco. These projects involved planning, materials, man-power
and "installing to completion"
platforms with top-side modules / hook-up, Drilling Rigs &
Ships, FPSO / FSO’s, pipelines, risers, SBM's, refurbishments, repairs
/ additions / alterations to completion with all QHSE / Safety requirements
plus “on the job” training of O & G
personnel. In
Vietnam I conducted a survey and refurbished an offshore Derrick / Pipelining
Barge required for platform / top-side module and pipeline projects
for major Oil Companies. Design, planning, materials, equipment , manpower,
scheduling and Client coordination. 1995 - 1997 COMPANY : PT MEGA DAYA : ENGINEERING SERVICE COMPANYLOCATION
:
JAKARTA POSITION : PROJECT ELECTRICAL
ENGINEER
Employed
to repair and reinstate a Steam
driven Turbine Generator 6 M.W. (6KV) for a Textile Manufacturing Company coordinating
with the manufacturer of the Generator and the Client until completion
/ acceptance and resumed normal operations. Organised
and implemented a refurbishment program required to re-instate Electric
and Diesel driven welding machines (100 each) for a Top-side Module
project in West Java. Conducted
a Power Study Survey of the Padang Cement Company Electrical distribution
system recommending improvements, additions, alterations and provided
training to operations and maintenance personnel
on problem solving, operation of generators in parallel, load sharing,
load shedding, power factor correction and system response. 1994 - 1995 CLIENT
: PT KENCANA COAL
INDONESIA LOCATION
: SUMATRA ( RIAU ) POSITION : ENGINEERING
MANAGER Responsible
for the design, planning, equipment and material sizing / identification
/ procurement, installation /commissioning, supervision of all contractors
and personnel, electrical / mechanical scope of work including regulation
compliance at a Coal mine. Project
involved a Diesel Power Generation
plant 4.2 M.W. 6 KV / 20KV transmission, transformers, crushing plants,
pumping stations, workshops, stores and office centre. Lighting, air conditioning, all cabling plus terminations, main
switchboards / distribution panel design / manufacture / installation
to completion and operational service.
Provided
"on the job" training to Site personnel in all operations,
trouble shooting, fault finding, preventative maintenance and HSE /
Safety practices and procedures. 1993 - 1994 CLIENT
: POWER GENERATION PLANT ( 2 x 27 M.W .) LOCATION
: SULAWESI - INDONESIA POSITION : ENGINEERING MANAGER
Responsible
for the Installation / Commissioning involving Steam driven 27 M.W.
Turbine Generator Units to turn-key status. Supervision of all sub-contractors
and personnel working on a 24 hour rotation schedule,
design, planning, materials, solving interface problems, client coordination
and project monitoring ensuring regulation compliance / contract requirements
were satisfied to the Client’s approval. Project
included PLC, DCS, UPS, HV / MV / LV cabling, new Switch Gear, MCC’s,
distribution panels, transformers, transmission lines and distribution
to end-items. Client
coordination with Contractors required as new Steam Boilers were involved.
Preparation of job progress reports, Site Supervisor in-charge of safety
practices and procedures, all QHSE requirements coordinating with the
Client until acceptance. 1985 - 1993 PROJECT
: OIL & GAS CONSTRUCTION / PIPELINING / HOOK-UP LOCATION : MIDDLE EAST / S. E ASIAPOSITION : PROJECT ELECTRICAL
ENGINEER Responsible for the design, planning, engineering, material and equipment identification plus sizing, installation / commissioning of the Electrical / Instrumentation Hook-up of Production platforms in Indonesia, Brunei, Malaysia, Vietnam and Saudi Arabia. Duties included defining all work tasks, project man-hours, supervision of contractors, work / actual progress reporting, completion and commissioning tasks ensuring that all activities satisfied the Oil & Gas codes / rules and regulations with Client acceptance. Provided
technical and practical training to offshore engineering personnel.
1979 - 1985 PROJECT
: OIL & GAS CONSTRUCTION / PIPELINING / HOOK-UP LOCATION
: MALAYSIA/BRUNEI/MIDDLE
EAST/INDONESIA/AUSTRALIA POSITION :
PROJECT ELECTRICAL
ENGINEER
Responsible
for the Brunei Shell “Champion 7” Electrical Hook-Up Project. Involved
Topside modules, Power Generation 20 MW, Submarine cables, all electrical
services, Switchgear, MCC’s with Commissioning to Shell approval and acceptance. Transferred
to Saudi Arabia as the Middle East Specialist Project Engineer
responsible for all Engineering onshore / offshore with Saudi Aramco
/ Jardine Offshore venture. This involved planning, training, construction, engineering, power generation / modules / pipelines / drilling rig removal / placement / refurbishment / repairs / alterations. Employed offshore in Bass Strait and the N.W. Shelf on new platform installations. 1976 -1979 PROJECT : HAZELWOOD POWER STATIONLOCATION
: AUSTRALIA - U.K. C. A. PARSONS ( REYROLLE PARSONS ) POSITION :
SITE ELECTRICAL
ENGINEER
Following training in England (2 years) with C.A. Parsons appointed as the Electrical Engineer installing to completion / commissioning status and Client acceptance 120 Megawatt steam driven Turbine Generators for the Electrical Authority of Victoria. 1974 - 1976 PROJECT : INDONESIA PALAPA DOMSAT SATELLITE PROGRAMLOCATION : INDONESIA - IRIAN JAYA
- ITT-FEII
POSITION : POWER CHIEF
& LOGISTICS MANAGER Responsible
as the Power Chief and Logistics Manager for the Domsat - FEII Project
installing fifteen Earth Satellite Stations inclusive of Power Generation,
Distribution, Mux buildings,
Sub-contract supervision, materials, all Site services and engineering. ELECTRICITY TRUST OF
SOUTH AUSTRALIA Employed
as an Apprentice Electrical Fitter / Mechanic at the Osborne Power Station involving 30,
45, and 60 M.W. Steam Turbine
Generators and distribution of same. Achievements
: Graduated with Credit Pass / awarded State General Application Prize.
REFEREES (1) Bob Bieber
Maxus Oil Company Senior Project Engineer 62 - 21 - 515 9613 (2) Alan Cumberbirch
PT. Mega
Daya General Manager 62 - 21 - 460
0192 (3) Mike Whiston Tuthill
Corporation / Coppus Murray Div Company Director 65 - 468 0216 |
||||||
|
||||||